- StudyBlue
- Aviation Logistics 411
Aviation Logistics 411
About this deck
By: Rick Mccarthy
Created: 2012-05-14
Size: 26 flashcards
Views: 15
Created: 2012-05-14
Size: 26 flashcards
Views: 15
About StudyBlue
STUDYBLUE makes things that make you better at school.
Things like online flashcards with photos and audio.
Things like personalized quizzes and friendly reminders about when (and what) to study next.
Think of it as a digital backpack™: access to all of your study materials online and on your phone.
STUDYBLUE exists to make studying efficient and effective for every student, for free. Join us.
“I have used this website for three exams, and I see a huge difference in my test results.”
Naj
Naj
Sign up (free) to study this.
Define ALT and PLT
Administrative Lead Time (ALT) :
time from identification of a need until the order is put on contract
Production Lead Time (PLT): manufacturing and delivery time
time from identification of a need until the order is put on contract
Production Lead Time (PLT): manufacturing and delivery time
Name the 3 types of customer service relating to sales or transactions
Before the sale (pre-transaction)
During the sale (Transaction)
After the sale (post transaction)
During the sale (Transaction)
After the sale (post transaction)
Define a Multinational firm or organization
an organization that is operating in more than one country
Define Bill Of Lading
provides a contract for movement of a shipment,
a receipt for goods, and
a title for goods in some cases
a receipt for goods, and
a title for goods in some cases
Define inventory holding costs, ordering costs, and total costs?
Carrying costs or holding costs
Warehouse and material handling
Ordering costs
Transportation and purchasing
Total costs = holding + ordering
Warehouse and material handling
Ordering costs
Transportation and purchasing
Total costs = holding + ordering
Define safety stock
is the quantity stored to protect against stock outs
Describe the 2 types of purchasing or contracting authority
Centralized = Purchasing or Contracting only has authority
Decentralized = Authority provided to other functional areas (P-cards or credit cards)
Decentralized = Authority provided to other functional areas (P-cards or credit cards)
Know Economic Order Quantity (EOQ)
is a model to determine the order size that minimizes the sum of carrying and ordering costs
Know the 3 requirements of a Just In-Time Inventory System
A detailed relationship with suppliers
A supplier with a great quality program
Strict control of the process
A supplier with a great quality program
Strict control of the process
Know the Electrostatic Discharge (ESD) protective packaging objectives
to eliminate the static generated by the packaging materials
to shield from static sources outside the package
to shield from static sources outside the package
Name 3 baselines for maintenance procedures
hours
cycles
calendar time
cycles
calendar time
Name the 2 major groupings of warehouse major functions
Movement
Storage
Storage
Name the 2 types of packaging protection
Environmental
Physical
Physical
Name the 3 phases of materials handling
Capture, Movement, Release
Name the 5 modes of transportation
Rail
Motor freight
Water
Air
Pipeline
Motor freight
Water
Air
Pipeline
Name the 5 types of maintenance
Inspection
Scheduled Maintenance
Unscheduled Maintenance
Major Repair and Overhaul
Preventative Maintenance
Scheduled Maintenance
Unscheduled Maintenance
Major Repair and Overhaul
Preventative Maintenance
Be able to define price analysis and cost analysis
Price analysis is a comparison process (looks at bottom line price)
Cost analysis is a detailed analysis of all elements (direct costs, indirect costs, and profit)
Cost analysis is a detailed analysis of all elements (direct costs, indirect costs, and profit)
What type of inventory cost will increase when buying in large quantities? (Quantity Discounts)
Inventory holding or carrying costs
Be able to define dunnage.
Objects used to brace, steady, or support freight
Basically detention
Basically detention
Be able to name the 4 Ps of Marketing
Place
Promotion
Product
Price
Promotion
Product
Price
Be able to define a Firm Fixed Price Contract
Bottom line price to deliver the product or service
Places the greatest amount of risk on the contractor
Places the greatest amount of risk on the contractor
Be able to define acceptance of a product or service
Is the act of taking title to that product or service
Understand FOB Origin and FOB Destination
FOB Origin buyer takes title and is responsible for transportation at the manufacturer?s plant
FOB Destination buyer takes title at his/her location and contractor is responsible for transportation
FOB Destination buyer takes title at his/her location and contractor is responsible for transportation
Be able to name 10 basic logistic elements
Maintenance Planning
Manpower and personnel
Supply support
Support equipment
Technical data
Training and training support
Computer Resources Support (CRS))
Facilities
Packaging, Handling, Storage, and Transportation (PHST):
Design Interface
Manpower and personnel
Supply support
Support equipment
Technical data
Training and training support
Computer Resources Support (CRS))
Facilities
Packaging, Handling, Storage, and Transportation (PHST):
Design Interface
What is Administrative Lead Time (ALT)?
time from identification of a need until the order is put on contract
What it Production Lead Time?
The time from manufacturing and delivery time
About this deck
By: Rick Mccarthy
Created: 2012-05-14
Size: 26 flashcards
Views: 15
Created: 2012-05-14
Size: 26 flashcards
Views: 15
About StudyBlue
STUDYBLUE makes things that make you better at school.
Things like online flashcards with photos and audio.
Things like personalized quizzes and friendly reminders about when (and what) to study next.
Think of it as a digital backpack™: access to all of your study materials online and on your phone.
STUDYBLUE exists to make studying efficient and effective for every student, for free. Join us.
“I have used this website for three exams, and I see a huge difference in my test results.”
Naj
Naj